Heavy Duty Hard Rock Drilling Coal Mine Roadheader Ebz135 Tunneling Coal Mine

Hefty duty challenging rock drilling coal mine roadheader EBZ135 Tunneling Coal Mine Roadheader For Sale

EBZ coal mine roadheader is primarily employed in coal roadway, semi-coal roadway and delicate rock roadway and tunnel tunneling. Substantial configuration, risk-free and reliable. Via the second transportation aircraft, it can be matched with dump truck, shuttle truck, belt conveyor, and many others. to recognize ongoing slicing, loading and transportation.
Operating method: primarily consists of walking system, working system, loading system and transfer system. As the walking system advancements, the chopping head in the doing work mechanism breaks rocks and carries them away. It has the benefits of protection, large effectiveness and excellent good quality.


Digital Management Method
EBZ135 highway header adopts explosive-evidence and intrinsically safe switch box and intrinsically protected operation box which are modest in volume, light in bodyweight, flexible in procedure, protected and reputable principal controllers are mounted in a sealed shell to shield electromagnetic interference effectively operating problems are displayed on Lcd display, it adopts menu sort procedure interface and it is versatile and protected to established parameters it possesses, overvoltage, motor overload, period loss, quick circuit, in excess of-temperature and earth leakage lockout functions etc.

CZPT Program
EBZ135 kind street header adopts continuous energy, force minimize off and load sensitivity control. Main hydraulic factors adopt goods of globe famous brands.

Reducing CZPT
Slicing head is optimized with emulation strategy cutting tooth adopts items from Kennametal CZPT its layout is sensible and rock breaking ability is strong. 

Spraying Method
Spraying system of EBZ135 sort street header consists of interior spraying technique and exterior spraying method. Inside spraying method is to spray behind teeth so reinforce exterior spraying technique style of external spraying system is realistic internal spraying possesses water leakage detecting purpose.

First CZPT
Very first conveyor adopts straight construction and is related with insertion board smoothly. The conveying procedure is unobstructed.

Touring Mechanism 
Travelling driving technique extremely integrates motor and reduction equipment with internationally advance technologies its output torque is massive and it is ideal for operation with huge dip angle.
If there is limit on excess weight or general top during transportation, the highway header can be disassembled to transportation.

 

CZPT Specifications  
Main CZPT Specification EBZ135
Electrical power of slicing motor 135Kw
Power of gas pump motor 75Kw
Cutting range Top: 4 m
Width: five.one m
Equipment fat 38.8 T
Dimension (LxWxH) 8.92×2.8×1.fifty three m
Rotary pace of cutter head forty four r/min
Rotary velocity of star wheel 33 r/min
Loading capability three.four m³/min
Velocity of 1st conveyor forty m/min
Pace of driving device ~6.5m/min
Gradeability ±18º
Gantry top 420 mm
Gas tank volume 500 L
Dinting depth .2m
Supply voltage AC1140/660V

Product Rewards:

1> The chopping segment has the purpose of internal and external spray, leakage detection and security, the reducing motor has thermal defense, the slicing head is cone-shaped, and the tooth foundation is spiral. The inside spray seal adopts the world’s leading automated compensation technologies with impartial house legal rights, which fully solves the dilemma of unreliability of internal spray in the tunneling machine. Patent no. : ZL2006 20138210.eight.

2 > The width of the plate is two.5m and two.8m, which are CZPT for end users to choose. The functioning surface of the plate adopts double-sided Angle, which is handy for loading and cleaning. and the overall style makes the device far more successful. The charging system is driven straight by a minimal-velocity huge torque motor with a curved 3-tooth star wheel.

3> The transportation plane adopts medium double chain, bilateral chain and sleeve simple roller chain transport structure, which is suited for the transportation of coal, semi-coal rock and rock resources. The base plate is linear and the transport is easy, and the scraper transport is straight driven by two minimal-velocity and substantial-torque hydraulic motors.

4> going for walks portion adopts the highly built-in framework of reducer and hydraulic motor, with little quantity and large trustworthiness. The climbing system adopts the merged structure of growing oil cylinder and changing plate.

5> CZPTal program is controlled by programmable controller and has the features of new complete defense method module to understand safety, dynamic screen of wave crystal Chinese characters, thermal safety of cutting motor, automated method fault detection and memory.

6 > hydraulic program pump and operating valve undertake the world’s most sophisticated unit which impoort type German, with constant power management, stress reducing, load sensitive functions.

7 > The rear assistance unit realizes the long span assist and increases the equipment steadiness.

OUR Advantage:

We have our very own following-sale support engineers who had a lot more than 40 years experience.

We can provide the most aggressive price and the most expert provider.

We have seasoned international trade staffs who can support resolve problems in time.

Why select us
1. We could provide seven*24H support at the 1st time for specialized assist and authentic components offer.
2 .Attention to internet site before sale, quality in sale and training after sale.
three. Our business has advanced machining products, scientific technological procedure and sophisticated screening products.

FAQ
one:What kind conditions of payment can be recognized?
  For conditions of payment,L/C,T/T,D/P(can be)could recognized.

2: What certificates are CZPT in CZPT?
  For the certificate, we have CE, ISO,SGA.

3: What about the supply time?
  seven-thirty days right after receiving the deposit.

four: What about the warranty time?
  12 months right after shipment or 2000 working hours, whichever occuts 1st.

5. What about the Minimal Buy Quantity?
  The MOQ is 1 pcs.    
 

Heavy Duty Hard Rock Drilling Coal Mine Roadheader Ebz135 Tunneling Coal Mine